Work is moving along with the flooring. Tuesday saw the delivery of the green mosaic tile (the tile was tape-faced and has proved perfect for machine cutting), along with Nelson from James Flooring installing the underlayment in the front of the church (first picture). James Flooring spent most of the day yesterday leveling the floor at the front of the church and have transferred their mock-up (second picture) and markings to the front at the intersection of the center aisle and the cross aisle. Laying the tile began Thursday (third picture).
|
|