Capital Campaign
1716 Spruce Street building purchase
Elevator project May–October 2010
Sanctuary floor installation
Choir Loft modifications: August 2009
Catacombs Renovations: August–December 2008
The Elizabeth and David Koop Memorial Organ installation: August–September 2008
Ways to Give

Printer friendly versionPrinter friendly version

   Search this Site
 
 


Sanctuary floor installation

 
 
Tile in the aisles
Laying the tile in the aisles, January 25-29, 2010

Work is moving along with the flooring. Tuesday saw the delivery of the green mosaic tile (the tile was tape-faced and has proved perfect for machine cutting), along with Nelson from James Flooring installing the underlayment in the front of the church (first picture). James Flooring spent most of the day yesterday leveling the floor at the front of the church and have transferred their mock-up (second picture) and markings to the front at the intersection of the center aisle and the cross aisle. Laying the tile began Thursday (third picture).

Installing the low wood platform below the pulpit
 